Before I glue my work together I put it all together dry so that I can check its square and so it all fits together without any gaps. During this checked the stability making sure it didn't wobble. I also checked that all joins were 90 degrees. when I did this I realized that i had missed a rail which i later added in. during this i also made sure that all the rails were flush with the legs or had a quirk where need be.
Callum Mitchell
dry run
Updated: Aug 7, 2018
Comments