dry run
- Callum Mitchell
- May 15, 2018
- 1 min read
Updated: Aug 7, 2018

Before I glue my work together I put it all together dry so that I can check its square and so it all fits together without any gaps. During this checked the stability making sure it didn't wobble. I also checked that all joins were 90 degrees. when I did this I realized that i had missed a rail which i later added in. during this i also made sure that all the rails were flush with the legs or had a quirk where need be.
Comments